Job verified by Fuzu

Eskom Uganda Limited   |   Uganda   |   Log in or register to see the closing date

Mechanical Artisan- Nalubaale station

  • Diploma, Associate's degree
  • Mechanical engineering
  • Experienced (senior worker)
  • Full Time
  • Permanent

Oh dear! This job has already closed. But don't worry, you can find other similar jobs from Fuzu.

Jobs similar to Mechanical Artisan- Nalubaale station
Design Trainee – Engineering
  Summit Recruitment &Training  
  Nairobi
Jobs in Mechanical engineeringMid-Level jobsJobs located in Uganda

Job Summary

Reference Number: MECHART/2018/01

To assist technicians to carry out mechanical maintenance activities and routine works on the plant


Responsibilities

Plant Repairs

  1. Repair and cleaning of equipment in the mechanical section
  2. Replace seals and guides on gates
  3. Dismantle and repair control gates
  4. Cure oil leakages on pumps
Preventative Maintenance
  1. Inspecting machines, pumps, bearing, motors, screens, bolts, cranes, (mainly assist Technicians during preventive maintenance).
  2. Cleaning machine parts
  3. Service and grease machine parts as necessary
  4. Transformer pit cleaning
  5. Dismantle and erect scaffoldings
Any other duties assigned.
  1. Handle repairs of plant, modifi cations and troubleshooting for solutions while ensuring safety of plant, equipment and people.
  2. Participate in project execution.


General Information

Salary rangeNot specified
Additional informationNot specified
Contract type: Permanent
Job type: Full Time
Location: Uganda
Area of work: Mechanical engineering
Seniority: Experienced (senior worker)

Job Requirements

Required education: Diploma, Associate's degree
Required relevant work experience: 2 years
Required skills: Load calculations and mechanics; Mechanical drawings; Mechanical tools; Work place safety; Equipment and tool maintenance
Required languages: English (Spoken: fluent | Written: fluent)

Eskom Uganda Limited

Energy, utilities, environmentCompany size: 1000+ people

Eskom Uganda Limited is the largest generator of energy in Uganda and was incorporated in 2002 for a 20 year concession under a government regulatory framework