Closing: May 10, 2024
This position has expiredPublished: May 3, 2024 (16 days ago)
Job Requirements
Education:
Work experience:
Language skills:
Job Summary
Contract Type:
Sign up to view job details.
The Job Holder is responsible for:
- The preparatory works prior to construction activities for AGI construction for LOT 1 – PS1, PS2 And MC-PS1, MCPY1, MCPY3 and MCPY4.
- Reviewing of AGI and CAMP’s early civil works (ECW) construction documentations – including implementation of the detail design MTO and contribution in any required relevant up-dates.
- Managing the early civil works construction activities for Uganda Pump stations PS1, PS2 and Camps MC-Feeder line, MC-PS1, MCPY1, MCPY2,MCPY3 and MCPY4
- Managing the coordination with the subcontractors’ activities from the bidding phases till the hand over and final documentations.
- Performing ECW construction activities fully compliant with EACOP, IFC and countries HSE standards, business ethics, all within a zero-accident safety culture approach
- Delivering the EACOP AGI facilities within approved project construction schedule, approved budget, and integrating National Content requirements
Requirements
- BSc (or equivalent formal qualification) in a recognized Engineering discipline in Civil engineering
- Minimum of 10 years’ experience with at least 5 years in Oil &Gas Industry with similar large-scale projects
- Ability to adapt and to represent the company in discussions, negotiations and meetings with contractors, partners, and regulatory authorities.
- Ability to effectively lead and manage a team; Sound organisation ability; Ability to work in a multi-cultural business environment; Good interpersonal and communication skills; Good motivational skills.
- English as mother tongue or Fluent in English (speaking and with excellent writing skill)
Responsibilities
The Job Holder is responsible for:
- The preparatory works prior to construction activities for AGI construction for LOT 1 – PS1, PS2 And MC-PS1, MCPY1, MCPY3 and MCPY4.
- Reviewing of AGI and CAMP’s early civil works (ECW) construction documentations – including implementation of the detail design MTO and contribution in any required relevant up-dates.
- Managing the early civil works construction activities for Uganda Pump stations PS1, PS2 and Camps MC-Feeder line, MC-PS1, MCPY1, MCPY2,MCPY3 and MCPY4
- Managing the coordination with the subcontractors’ activities from the bidding phases till the hand over and final documentations.
- Performing ECW construction activities fully compliant with EACOP, IFC and countries HSE standards, business ethics, all within a zero-accident safety culture approach
- Delivering the EACOP AGI facilities within approved project construction schedule, approved budget, and integrating National Content requirements
Requirements
- BSc (or equivalent formal qualification) in a recognized Engineering discipline in Civil engineering
- Minimum of 10 years’ experience with at least 5 years in Oil &Gas Industry with similar large-scale projects
- Ability to adapt and to represent the company in discussions, negotiations and meetings with contractors, partners, and regulatory authorities.
- Ability to effectively lead and manage a team; Sound organisation ability; Ability to work in a multi-cultural business environment; Good interpersonal and communication skills; Good motivational skills.
- English as mother tongue or Fluent in English (speaking and with excellent writing skill)
- To support the Lot Manager and the Package Manager to manage the ECW construction contracts and relevant activities; monitoring contractors’ achievement and review Change Orders Requests related to construction activities.
- To control the ECW construction package, quality, cost, and progress in accordance with approved project requirements, budget and schedule.
- To promote cost reduction initiatives and strive to optimize costs and achieve value at every opportunity.
- To assist the Lot Manager and the Package Manager in monitoring and to account for and follow-up mitigation of project risks.
- To organize and propose the AGI construction team for LOT 1 ; interacting with a multi-disciplinary technical team efficiently and in a good working atmosphere and integrating as need be partners secondees.
- To work with in full coordination with EACOP construction team ensuring best use of project resources and efficient implementation of Quality Surveillance teams
- On LOT 1 – PS1, PS2 and Camps MC-PS1, MCPY1, MCPY3 and MCPY4, to coordinate and interface with other Project development entities (Engineering, Operations, HSEQ, E&S team and project control groups).
- To ensure construction Sub-contractors implement the project National Content plan and E&S mitigations plan.
- To report progress and provide input to weekly and monthly reports.
- To ensure the teams under job-holder’s responsibility are appropriately supervised and have received adequate instruction and training to carry out their role in a safe manner.
- To Coordinate and interface with all LOT 1 – PS1, PS2 and Camps MC-PS1 , MCPY1, MCPY3 and MCPY4 entities to ensure construction needs are accounted for in the design and procurement activities and that project early activities schedule coincide with construction plan.
- To ensure compliance with EACOP obligations under Upstream agreement for sections included in Pump Station PS1.
- Act as construction ECW site lead
- To adopt and demonstrate exemplary behaviour with regard H3SE and H3SE rules implementation.
- To adopt and demonstrate exemplary behaviour about ethics and project “code of conduct” policy.
- To participate to meetings with partners, authorities and other stakeholders as required whenever advised by line managers.
- To carry out any other duties or tasks that may be required by the position.
Applications submitted via Fuzu have 32% higher chance of getting shortlisted.