Lake Turkana Wind Power Ltd

Kenya

Energy, utilities, environment

About

LTWP is connected to the Kenyan national grid through a 438km associated transmission line constructed by the Government of Kenya through the Kenya Transmission Company (KETRACO). LTWP provides reliable, low-cost energy to Kenya’s national grid – approximately 11% of the country’s installed capacity, to be bought at a fixed price by The Kenya Power and Lighting Company PLC (Kenya Power) over a 20-year period in accordance with the Power Purchase Agreement (PPA).

Jobs

Lake Turkana Wind Power Ltd

Security Control Room & Systems Supervisor

Nairobi, Kenya

Lake Turkana Wind Power Ltd

Projects Quantity Surveyor

Nairobi, Kenya

Lake Turkana Wind Power Ltd

Intern- Human Resource

Nairobi, Kenya

Lake Turkana Wind Power Ltd

Intern - Legal

Nairobi, Kenya

Lake Turkana Wind Power Ltd

Intern - Technical

Marsabit, Kenya

Key facts
Location
Kenya
Size
100-500 people
Industry
Energy, utilities, environment
Phone
+254 (0)20 221 3493