
Senior Architect - Finishing Works / Interior Fit-Out Completion
Civil and Structural Engineer

Get personalised job alerts directly to your inbox!
Top cities with open vacancies
Jobs in Lagos, Jobs in Abuja, Jobs in Port Harcourt, Jobs in Buliisa, Jobs in Nairobi, Jobs in Kampala, Jobs in Garissa, Jobs in Sagamu, Jobs in Ikoyi, Jobs in Abeokuta, Jobs in Nakuru, Jobs in Mombasa, Jobs in Masalani, Jobs in Kisumu, Jobs in Kiambu, Jobs in Embu, Jobs in Yola, Jobs in Ota, Jobs in IlesaCompanies hiring now
Dangote Group, International Breweries Plc , Nile University of Nigeria, TotalEnergies, Widows and Orphans Empowerment Organization (WEWE)Profession (Mid-level)
Industry (Engineering, architecture, Mid-level)
Seniority (Engineering, architecture)
© Fuzu Ltd

Manufacturing
Senior Architect - Finishing Works / Interior Fit-Out Completion
Description
Qualification and Experience
- Bachelor’s degree in Architecture. Master's Degree in Architecture preferred.
- A total of 12–15 years of architectural experience is required with a minimum of 8-10 years directly managing finishing works, interior fit-out or architectural completion works.
- Member of the Nigerian Institute of Architects or equivalent international professional membership is an advantage.
- ARCON registration or eligibility preferred for Nigeria-based practice.
- Strong site-based experience including inspections, mock-ups, shop drawing review, coordination meetings, snagging and handover.
- Must have completed at least two projects above 20,000m2, or one major HQ, hotel, airport, luxury commercial or Grade A office tower project.
1.Design and shop drawing control
Review and comment on architectural, fit-out, reflected ceiling, partition, joinery, door, furniture and finish drawings. Maintain shop drawing and material submittal registers.
2. Mock-ups and sample approvals
Coordinate sample boards, benchmark rooms, material approvals and mock-ups before mass installation.
3. Site quality control
Conduct daily site inspections, check workmanship, tolerances and substrate readiness, reject defective works and maintain photographic records.
4. Interface coordination
Coordinate architectural finishes with MEP, ELV, AV, ICT, lighting, sprinklers, HVAC diffusers, access control and furniture.
5. Programme control
Review finishing programmes and 2-week lookaheads, identify critical long-lead items and escalate delays affecting the 8-month target.
6. Procurement support
Track finish materials, partition systems, doors, ironmongery, furniture, samples and factory production status.
7. Snagging and handover
Lead floor-by-floor snagging, de-snagging, final inspection and handover acceptance.Track finish materials, partition systems, doors, ironmongery, furniture, samples and factory production status
8. Reporting
Issue weekly architectural finishing report covering progress, quality risks, submittals, procurement risks and handover status.
Start hiring with Fuzu
Recruit better talent faster - on your own or with our support.
Explore recruitment platformJob search tips from Fuzu
Selected articles on cover letters, CV structure, and interview preparation.
